Upgrade reports
Warning
The page appears only when the migration of Steps was performed.
This page contains:
This page shows the status of the migration from old Steps (Dynamic Table CF) to new Steps (TestFLO Steps) and all components associated with it.
Steps
To get to the Upgarde reports page:
- Go to the Jira Administration > Add-ons
- Click the Upgarde reports page
Result
View of Upgrade reports page.
Migration
During the migration of the Steps a progress bar will be displayed in Upgrade reports page. TestFLO users are also informed about the migration duration in the Test information panel. After the migration is completed, the corresponding status is displayed.
Migration status
Status completed
If the migration was performed correctly, a message about the version will be displayed and the migration status will be shown as completed.
Status incomplete
If status is shown as incomplete the migration was performed but some components will need manual change (these can be workflows, validators, conditions etc.). In this case, manual verification of the conflicts will be needed. Click Details to check the result of the report and make all necessary operations. After repairing all conflicts, the status will be automatically changed to completed.
Status fail
If the upgrade status will be displayed as failed, the Steps migration failed due to unexpected errors. In this case, all changes will be reverted. To try again the migration click the Start migration button or contact with the support team at Customer Portal.