Sent worklogs to remote Jira
Tracking Worklogs
Worklog synchronization can be useful to track progress of tickets or overall project progress.
- In this scenario worklogs synchronization is enabled on left contract. The entries were created in SSP-25 and replicated to SC-1.
- Worklog created by "Administrator" user is synchronized using "Technical User". It has to have Worklog Permission in that project.
This is because User Directories often differ between two synchronized JIRAs.- However, you got information about username / connection /contract / time of original worklog in the description.
- Worklogs are ordered chronological based on reported time in worklog entry (not time when user added a worklog).
- Workflogs are synchronized incremental - changes to worklogs are not propagated to the remote JIRA.
If receiving worklog is disabled in configuration then you will get follwoing status:
That is how it looks in remote Jira
Setup
In this section you can select if you want to synchronize worklogs:
Expose Time Spent | If a user will log work on issue, then it can be send to remote JIRA |
Receive Time Spent | If a worklog is received from remote issue, work can be logged to the issue |